GLENFARNE BECOMES LEAD DEVELOPER FOR THE ALASKA LNG PROJECT

FOR IMMEDIATE RELEASE​​​
MARCH 27, 2025

Glenfarne, Alaska Gasline Development Corporation Sign Binding, Definitive Project Development Agreements Enhancing Momentum For The Project

Alaska LNG Pipeline Final Investment Decision Anticipated in 2025

See full release

Aiming for energy security, Taiwan seeks to invest in Alaska LNG project

20 March 2025
Reuters

See article

Alaska Governor Says Trump Actions Boost Plan to Ship LNG to Asian Allies

2025 March 15
Epoch Times
By John Haughey

Gov. Mike Dunleavy closes five-day CERAWeek conference by confirming the president’s ‘unleashing American energy’ policies are doing exact that.

See article

Sullivan Links Alaska LNG Pipeline To Potential Defense Funding, Pushes To Reopen Adak Naval Base

Author: Nick Sorrell | March 13, 2025
KSRM Radio Kenai

See article

Letter in support of federal loan guarantees for Alaska LNG Project from Alaska U.S. Congressional Delegation to U.S. Department of Energy Secretary Chris Wright

2025 March 04

See letter

Trump Touts Plans to Propel Mammoth Alaska Gas Export Project

2025 March 04
Project would open markets for stranded Alaska natural gas Japan, South Korea and other nations interested, Trump says

Bloomberg – By Jennifer A Dlouhy

See article

Pantheon Resources plc Multi-zone flow tests planned for Megrez-1

2025 March 03

See release

Pantheon Resources plc (AIM:PANR, OTCQX: PTHRF) (“Pantheon” or the “Company”), an oil and gas company developing the Kodiak and Ahpun oil fields in close proximity to pipeline and transportation infrastructure on Alaska’s North Slope, today announces further details of its planned flow testing programme for the Megrez-1 well.

Key Points

  • Data from logs, cores, cuttings and seismic indicate seven discrete interpreted pay zones, with flow testing of the shallowest six to commence before the end of March 2025
  • Analyses of analogous offsets indicate potential flow rates ranging from 200 barrels per day (“bpd”) to 2,000 bpd for any specific zone, depending on the encountered reservoir quality and fluid properties
  • Pantheon expects flow rates from the deepest horizon to be tested (Topset 1) at the lower-end of the range and flow rates in the shallower horizons at the top of the range
  • Reliable estimates of in-place and recoverable contingent resources require successful flow tests to confirm fluid compositions and reservoir properties, including API oil gravity, gas-oil ratio and in situ saturations among others. Previous guidance still stands for the Upper Schrader Bluff and Prince Creek potential
  • Flow data will be released at the conclusion of testing for each horizon

The Flight Deck – Alaska Gasline Development Insights with Frank Richards

2025 March 02

Watch podcast

In this episode [8], the Flight Deck Crew have the pleasure of a great conversation with Frank Richards, President of the Alaska Gasline Development Corporation [AGDC].  The discussion deep dives into AlaskaLNG, Phase 1 & 2, from the AGDC perspective and we glean superb insights from the head of the organisation. Grab a cuppa and settle in for this one!  🍪

About Frank Richards – President AGDC

Mr. Richards is a registered professional civil engineer with more than 32 years of experience developing large-scale infrastructure, power, mining, and oil development projects. He oversees development and execution of all AGDC projects. He came to AGDC after serving as the deputy federal coordinator for Alaska Natural Gas Transportation Projects. He earned a B.S. in civil engineering from the University of Maine.

Trump seeks to reshape Asia’s energy supplies with US gas

2025 February 21
Reuters

See article

US support for Taiwan remains “very strong,” Taiwanese official says

2025 February 20
Reuters

See article