The liquefaction facility, located in Nikiski, will process and export up to 20 million tons of LNG per year using the Propane Precooled Mixed Refrigerant (C3MR™) Process, an Air Products and Chemicals Inc. (APCI) patented technology.
- Three LNG trains.
- Two 240,000 cubic meter storage tanks.
- The facility can transfer approximately 12,500 cubic meters of LNG per hour.
- Two loading berths to accommodate LNG carriers up to 217,000 cubic meters (Q-Flex).